[اقتباسات] 📘 ❞ Construction Manual for Power-Inverter Air Conditioner ❝ كتاب

الهندسة المدنية - 📖 اقتباسات كتاب ❞ Construction Manual for Power-Inverter Air Conditioner ❝ 📖

█ _ 0 حصريا كتاب ❞ Construction Manual for Power Inverter Air Conditioner ❝ 2024 Conditioner: MR: Slim Contents 1 Difference between Refrigerant R22 and Alternative R410A················································4 2 in Material of Pipe R410A ······················································5 3 Installation Procedures Cautions on ········································································ ····6 4 Airtight Test ··············································································································· ·······························7 5 Vacuuming (Vacuum Drying)··································································································· ·················8 6 Checking the Gas Leakage···································································································· ················10 7 Reusing Existing ··································································································· ···················11 8 Tools ······································································································ ························15 9 Charge ································································································ ··················16 10 Operation Condition ··························································································· ·············17 11 Capacity correction ········································································································ ························18 12 Field electrical wiring (Power specification) ······································································· ·········19 13 Check List Work ·· الهندسة المدنية مجاناً PDF اونلاين قسم خاص بكتب للتحميل مجال وهي أحد فروع والمعنية بدراسة وتصميم وتحليل المنشآت المختلفة كالأبنية السكنية والخدمية والطرق والجسور والأنفاق والمطارات والموانئ وشبكات إمداد مياه الشرب ومحطات ضخ المياه الصرف الصحي التنقية ومعالجة والسدود وكذلك مشاريع الري والإشراف عمل هذا أثناء فترة استمرارها لذا لا يجوز حصر العلم بأنه المعني بالتصميم وحده فقط وهي كأي علم تتطور باستمرار ودون توقف وفي الآونة الحديثة ترابطت مع التطور الصناعي بشكل كبير لإنتاج مواد إنشائية جديدة ومتطورة تفي بالمتطلبات التي تكون دائما متزايدة من المجتمع A special section books civil engineering that is one branches concerned with studying, designing analyzing various installations such as residential service buildings, roads, bridges, tunnels, airports, ports, drinking water supply networks, pumping stations, sewage purification treatment dams, well irrigation projects, supervising work this Establishments during period their continuation, so it not permissible to limit flag design alone

إنضم الآن وتصفح بدون إعلانات
Construction Manual for Power-Inverter Air Conditioner
كتاب

Construction Manual for Power-Inverter Air Conditioner

Construction Manual for Power-Inverter Air Conditioner
كتاب

Construction Manual for Power-Inverter Air Conditioner

مميّز
عن كتاب Construction Manual for Power-Inverter Air Conditioner:
MR: Slim


Contents
1. Difference between Refrigerant R22 and Alternative Refrigerant R410A················································4
2. Difference in Material of Refrigerant Pipe between R22 and R410A ······················································5
3. Installation Procedures and Cautions on Construction ········································································
····6
4. Airtight Test ···············································································································
·······························7
5. Vacuuming (Vacuum Drying)···································································································
·················8
6. Checking the Gas Leakage····································································································
················10
7. Reusing the Existing Pipe ···································································································
···················11
8. Tools for Installation ······································································································
························15
9. Tools for Refrigerant Charge ································································································
··················16
10. Checking the Operation Condition ···························································································
·············17
11. Capacity correction ········································································································
························18
12. Field electrical wiring (Power wiring specification) ·······································································
·········19
13. Check List for Existing Pipe Work ··

الترتيب:

#107K

0 مشاهدة هذا اليوم

#125K

0 مشاهدة هذا الشهر

#29K

9K إجمالي المشاهدات
عدد الصفحات: 24.
المتجر أماكن الشراء
مناقشات ومراجعات
QR Code
أماكن الشراء: عفواً ، لا يوجد روابط مُسجّلة حاليا لشراء الكتاب من المتاجر الإلكترونية