❞Pradipta Kumar Deb❝ المؤلِّف - المكتبة

- ❞Pradipta Kumar Deb❝ المؤلِّف - المكتبة

█ حصرياً جميع الاقتباسات من أعمال المؤلِّف ❞ Pradipta Kumar Deb ❝ أقوال فقرات هامة مراجعات 2025 ❰ له مجموعة الإنجازات والمؤلفات أبرزها An Introduction to Mine Hydrogeology ❱

إنضم الآن وتصفح بدون إعلانات
المؤلِّف Pradipta Kumar Deb Pradipta Kumar Deb Pradipta Kumar Deb
Pradipta Kumar Deb
المؤلِّف
المؤلِّف Pradipta Kumar Deb Pradipta Kumar Deb Pradipta Kumar Deb
Pradipta Kumar Deb
المؤلِّف
المؤلِّف
له مجموعة من الإنجازات والمؤلفات أبرزها ❞ An Introduction to Mine Hydrogeology ❝

#24K

14 مشاهدة هذا اليوم

#26K

6 مشاهدة هذا الشهر

#25K

2K إجمالي المشاهدات
نبذه عن الكتاب: Very often, in India, a mine planner or a mining engineer faces groundwater seepage problems, in either in a running mine or in an open mine (whether open pit or underground). This calls for a thorough in-depth hydrogeological analysis of the mining area. In doing so, a professional mine hydrogeologist has threefold responsibilities: (a) to ensure water supply to the mine or colonies or process plants, (b) to assess the groundwater seepage potential into the mines, and (c) to assess environmental impact on the surrounding hydrogeological regime. In this book, various case studies in relation to mine hydrogeological studies have been discussed. This study is unique because it emphasizes on the physical impact of mining on the hydrogeological environs, which has been dealt with a number of Indian case studies. This type of study has not been carried out earlier. Mine hydrogeology deals with the hydrogeological study of a mine, opencast or underground, in order to fulfil various requirements of the mine. In doing so, water well inventory in the area should be conducted and a water table map or an isopiestic map of the area should be prepared. Hydrogeological investigation needs to be carried out along with groundwater exploration through well drilling. Pumping tests of the exploratory well/s need to be carried out in the form of Step Drawdown Test (SDT) and Aquifer Performance Test (APT). These would help to determine the discharge, drawdown, and aquifer parameters like T, S, and K. Depending on the water demand of mines, colonies and process plants and based on the pumping test data, planning for groundwater development for the area needs to be proposed. For assessing groundwater seepage in the mine, mine development planning has to be understood first. The optimum pit depth and pit limit have to be worked out or known from the mine planners and aquifer disposition in the mine area needs to be depicted. Basic objective is to keep the water table below the working bench level in case of opencast mine, so that mineral or coal can be excavated without any seepage problem. Therefore, groundwater seepage computation has to be associated with the mine development planning. An underground mining project is initiated by driving an incline or adit or by lowering a shaft cutting through the geological formations. This means puncturing of both unconfined and confined aquifers which contributes toward groundwater seepage to the mine. Proper hydrogeological studies are required in such cases.
عدد المشاهدات
3722
عدد الصفحات
58
نماذج من أعمال Pradipta Kumar Deb:
📚 أعمال المؤلِّف ❞Pradipta Kumar Deb❝:

منشورات من أعمال ❞Pradipta Kumar Deb❝: